TEM030 Issue date
Operational Qualification Report
(Ref.VAL005)
Project Name | Project Number | ||
---|---|---|---|
Equipment | Serial Number | ||
Manufacturer | Model Number | ||
Process Line/Location | Protocol number |
Table of Content
PROCESS DESCRIPTION ...........................................................................................................2 OBJECTIVE.............................................................................................................................2 INSTRUMENTATION/CALIBRATION.............................................................................................2 TEST FUNCTIONS PERFORMED IN THE OPERATIONAL QUALIFICATION PHASE AND OVERALL RESULTS
OBTAINED: .............................................................................................................................2 ADDITIONAL VALIDATION REQUIREMENTS..................................................................................2 OVERALL CONCLUSION............................................................................................................3 PERFORMANCE QUALIFICATION PROGRAM ................................................................................3
Approval Of The Completed Operational Qualification Report | |||
---|---|---|---|
Department | Name | Signature | Date |
Project Coordinator | |||
Validation Manager | |||
Quality Assurance Manager | |||
Operations Manager | |||
Production Manager |
Approval signifies provisional approval of the equipment / system for production use.
File Location: Date Printed: Page 1 of 3
TEM030 Issue date
Operational Qualification Report
(Ref.VAL005)
Training and Procedures | All training requirements stated in the Validation Plan has been |
Established | fulfilled and approved by the Production Manager |
Training conducted | Yes / No – Sign & Date |
All SOP’s established | Yes / No – Sign & Date |
Overall Conclusion
Acceptance criteria for the overall program shall be based on the following:
- Successful precalibration data for all critical test instrumentation
- Successful completion of all test functions listed in Part 4.
- Successful postcalibration of all critical test instrumentation.
Tabulate and review all data referenced above. Form a conclusion as to the acceptability of the overall program based on the acceptance criteria specified above.
Conclusion:
(Text)
Performance qualification program
The following tests are to be conducted as part of the Performance Qualification phase:
Test Functions | Acceptance Criteria | |
1. | ||
2. | ||
3. |
Completed Operational Qualification Report:
Position | Signature | Date | |
---|---|---|---|
Documented by | |||
Checked by |
File Location: Date Printed: Page 3 of 3