TEM030 Issue date
Operational Qualification Report
(Ref.VAL005)
| Project Name | Project Number | ||
|---|---|---|---|
| Equipment | Serial Number | ||
| Manufacturer | Model Number | ||
| Process Line/Location | Protocol number |
Table of Content
PROCESS DESCRIPTION ...........................................................................................................2 OBJECTIVE.............................................................................................................................2 INSTRUMENTATION/CALIBRATION.............................................................................................2 TEST FUNCTIONS PERFORMED IN THE OPERATIONAL QUALIFICATION PHASE AND OVERALL RESULTS
OBTAINED: .............................................................................................................................2 ADDITIONAL VALIDATION REQUIREMENTS..................................................................................2 OVERALL CONCLUSION............................................................................................................3 PERFORMANCE QUALIFICATION PROGRAM ................................................................................3
| Approval Of The Completed Operational Qualification Report | |||
|---|---|---|---|
| Department | Name | Signature | Date |
| Project Coordinator | |||
| Validation Manager | |||
| Quality Assurance Manager | |||
| Operations Manager | |||
| Production Manager | |||
Approval signifies provisional approval of the equipment / system for production use.
File Location: Date Printed: Page 1 of 3
TEM030 Issue date
Operational Qualification Report
(Ref.VAL005)
| Training and Procedures | All training requirements stated in the Validation Plan has been |
| Established | fulfilled and approved by the Production Manager |
| Training conducted | Yes / No – Sign & Date |
| All SOP’s established | Yes / No – Sign & Date |
Overall Conclusion
Acceptance criteria for the overall program shall be based on the following:
- Successful precalibration data for all critical test instrumentation
- Successful completion of all test functions listed in Part 4.
- Successful postcalibration of all critical test instrumentation.
Tabulate and review all data referenced above. Form a conclusion as to the acceptability of the overall program based on the acceptance criteria specified above.
Conclusion:
(Text)
Performance qualification program
The following tests are to be conducted as part of the Performance Qualification phase:
| Test Functions | Acceptance Criteria | |
| 1. | ||
| 2. | ||
| 3. |
Completed Operational Qualification Report:
| Position | Signature | Date | |
|---|---|---|---|
| Documented by | |||
| Checked by |
File Location: Date Printed: Page 3 of 3
1 comment: