Position Paper: Are We Abandoning IQ and OQ?4

Science-based approach
Both documents stress good science. The ASTM standard discusses science and risk-based decisions in the same sentence. We are to apply science to risk-based decision making. xactly what this means is not readily evident. The ASTM standard also gives a reference to ICH Q8 as a definition and understanding of the science-based approach (6).
The FDA guideline discusses sound scientific methods and principles with the PQ based on sound science. Both documents do acknowledge the application and support of process analytical technology (PAT).
Between these two documents it is clear that rationalizations and decisions are to be made with good understanding of science. Other than the ASTM standard emphasizing risk, they both acknowledge the need for good science. Current role of the quality control unit or quality unit
This term quality unit (QU) is used in both documents. The words or group known as quality assurance is lacking in both. It is commonly understood that the QU is the sum total of all quality inclusive of QA and quality control (QC). The FDA validation guidance document gives more overall responsibility to the quality unit than the ASTM standard. The QU is to approve the qualification plan, PQ protocols, and reports. The FDA guidance document does address QU approving individual equipment and system qualifications. It stipulates that the qualification plan and the summarizing report must be reviewed and approved by the quality unit.
The ASTM standard has no formal mention of the QU other than to have them approve the verification plan, verification review documents, and the decision to use vendor documents as they apply to criticality. The QU does not participate in the review or approval of the verification documents, but just the final review documents.
A question to be raised is what happens if the quality unit disapproves of the verification review documents? Does it imply that the entire verification needs to be repeated? By not involving QA at the onset and throughout the process, how is it expected for them to defend the verification activities without an intimate knowledge of these activities?
In addition, the QA group has typically been responsible for ensuring that vendors and suppliers are savvy and compliant with current good manufacturing practices. Does the decision to use vendor documents without approving them affect this particular responsibility of the QU as well? The ASTM standard does not give this responsibility to QA and it is also not implied. FDA in other documentation does give QA the responsibility for overall vendor certification.
FDA initiatives
FDA independently has rewritten the original process validation guide that was issued in 1987. Among the reasons for the rewrite were that FDA has gained additional experience through its regulatory oversight, and the rewrite reflects the agency's current thinking on process validation. In reviewing this revised process validation guide, it is apparent that the FDA has maintained their stance on the words qualification and validation, but they appear to be backing away from the practices of IQ and OQ. The new FDA guidance on the surface appears to be more aligned with the current ISPE C&Q guide Volume 5 than the ASTM E2500 standard.
Due to internal budgets and resource constraints, FDA introduced other concepts. Among these was risk assessment. In an effort to harmonize, the FDA adopted, at least in name, the ISO (International Standards Organization) standards and ICH guidance documents such as Q9. These documents are available on the FDA website and mentioned in the risk-based approach document for pharmaceutical CGMPs for the 21st century. Though the risk was couched and stressed patient safety, those in the industry were to apply it to their daily operations. In effect, what has happened is that FDA has placed upon industry the need to proceduralize and defend the management of risk. It has never been clear how the industry were to evaluate this risk. When people in industry asked, they were referred to ICH Q9. The problem is that ICH Q9 is a descriptive document and not a how-to document. It also leaves it to us to develop our own method or tools if appropriate. These of course would then have to be justified and defended should they scrutinized during a regulatory audit.
A lot of time is spent analyzing and evaluating risk. This is really done to save money and time for product manufacture and sale. If certain testing or documentation can be avoided because it is considered low risk then all the better is the thinking. On the other hand, a lot of man hours are spent justifying this risk evaluation. There are many hidden costs and it is not clear that they all have been captured in the overall evaluation.

Position Paper: Are We Abandoning IQ and OQ?3

The subject matter expert
The role of the SME is emphasized in the ASTM standard. This is a role that has been described in other industry articles and documents but the consequences are not well defined. First and foremost, who are the SMEs? How do we pick them or justify them? Are SMEs to be consultants or a separate group with a different reporting structure within a company, since it is also stated that for certain functions, they are to be independent?
The FDA draft guidance makes no mention of subject matter experts but does speak of an integrated team using expertise from a variety of disciplines and the use of a statistician for continual process monitoring.
Quality by design and design of experimentIn compliance with another FDA initiative for the pharmaceutical industry, the ASTM standard discusses quality by design (QbD). The current FDA validation guidance makes no mention of the subject but does discuss design of experiment (DOE). It is not clear if DOE is the same as QbD. For QbD, the ASTM standard does emphasize critical aspects, assurance of fit, and GEP. The FDA guidance indicates that risk-analysis tools are to be used with DOE.
On another note, and in addition to the term quality by design, the ASTM standard discusses design review (DR). Design reviews are to incorporate risk assessments. They are to be performed by the SME. Nowhere is it apparent that the quality unit is to play a part in the review or approval of the DR. The relationship between the DR and the FDA DOE is also not explained in either document.
Plans
The FDA has always stressed the need for plans. Among the plans were those for compliance, remediation, and qualification. The plans have always been implemented as a means of expressing to the regulatory bodies the intent of the validation exercise and to logically, deterministically, and intelligently convey that the qualification process is under control and that the desired end result of regulatory compliance would be achieved.
With these two documents, we have a number of plans introduced. Words such as verification plan, project plan, and qualification plan are mentioned. The later two items in the previous sentence can be found in the FDA validation guideline. Neither document mentions the validation master plan (VMP), which was introduced by the industry to satisfy the need for a plan in qualification and validation and to control the cost and schedule of the qualification and validation activities. The question that emerges is what is the role of the VMP, or has it, too, been discarded? In today's pharmaceutical and medical-device industries, an entire hierarchy of plans has arisen around the VMP. Every site has endeavored to have an overall site-validation plan with the individual project and process validation plans referring to it. The site-validation plan is different from the site file, which is a European requirement. Though one would infer that verification plans and project plans are just a substitution of words, the word validation is missing in the definitions of the plans in both of these documents.
Change management
Change management is emphasized in both documents. In each document, changes during design and through the process are to be identified and evaluated. Among the differences between the documents is that the FDA guidance indicates that the project plan is to address how the evaluation of change is to take place.
Change management at one time was to be official once the production process was operational. Change control during design and validation was not handled exactly the same way. Typically once documents in design and validation were reviewed and approved by QA, official change management would then be in play. We have a situation where it is not clear what the extent of change management is to be during design and installation. Both documents stress the need for it, and most importantly the need for change management once the process in placed into operation. What is also missing from both of these documents is the mention or implementation of a corrective and preventative action (CAPA) system for which change control is very closely linked. More importantly is change management as practiced prior to manufacturing operations (i.e., engineering change management) the same and with the same stipulations as QA-supervised change management that is used during commercial manufacturing.

Position Paper: Are We Abandoning IQ and OQ?2

FDA
What is more intriguing is that FDA and even the European Union (EU) agree with these concepts of commissioning and the de-emphasizing of IQ and OQ—but not their elimination. This conclusion has been reached following FDA's participation in the very industry committees that have written these concepts into industry guidelines. FDA not only participated, but reviewed the documents from these committees and also tacitly approved them as well. Tacit approval was achieved by not making any statement pro or con with regard to the implementation of these practices over time. Most of the industry moved ahead and instituted the new methodologies.
The present situation
We now have two new documents regarding equipment and system suitability and qualification. These are recent additions, but we need to review them and once again adapt our understanding of the word qualification. ASTM, in cooperation with the International Society for Pharmaceutical Engineering (ISPE) has developed a new standard for the verification of equipment and system performance. This document is entitled "E2500-07 Standard Guide for Specification, Design, and Verification of Pharmaceutical and Biopharmaceutical Manufacturing Systems and Equipment" (2). The other document that also has been introduced for our use is FDA's Draft Guidance for Industry: Process Validation: General Principles and Practices (3). Both of these documents have been made public over the past year. Granted, we have known about their development for some time now.
Both documents have been tacitly approved by FDA. The agency reviewed and participated in the development of the ASTM standard, which is an issued document that can be purchased from the ASTM website. The FDA guidance is still in draft form but will certainly be issued as official guidance once FDA addresses the comments and finalizes the guidance document.
The most striking aspect of the documents is that they both deemphasize IQ and OQ. Neither document mentions these activities as installation qualification and operational qualification. The ASTM standard does not even mention the word qualification. The FDA draft guidance discusses qualification, but does not specifically mention the terms IQ or OQ. The draft guidance does expect performance and process qualification as an aspect of the overall process validation. Process validation is the sum total of all qualification activities performed.
It can be argued that the two documents address two different but related subjects within the scope of validation. The ASTM standard is geared to the acceptance of equipment and systems prior to performance qualification. The FDA guidance document emphasizes PQ but does have a major section devoted to the same subject matter as the ASTM standard.
GEP, risk assessment, and subject matter experts
The ASTM standard emphasizes verification, GEP, risk assessment, and subject matter experts (SMEs). Though the standard discusses documented verification and SME review, it is not clear what that documented evidence will look like. Certainly, QA or the quality unit is not being held responsible for review or approval of this verification activity. Criticality aspects of equipment and systems is reserved for QA review. Risk assessment is emphasized in the standard but it is not clear how that is to be achieved. Other than mentioning that the extent of verification and level of detail of documentation should be based on risk, not much else is said.
The FDA draft guidance also mentions risk assessment. It only references ICH Q9 in a footnote, but it does reference FDA's 21st Century Risk-Based Approach document (4, 5). The ASTM standard also references this FDA program. Though each document emphasizes risk and risk assessment, neither one indicates how it is to be achieved. The FDA guideline talks about risk in the sense of "control of variation and to combine conditions that pose a high risk of failure." The ASTM standard, however, requires that risk management be used throughout every aspect of the process and with every decision.
As stated above, the FDA draft guidance emphasizes qualification and only speaks to verification in the sense that it is to be achieved through qualification and continued process verification after process validation is completed.
The draft guide does not mention GEP, but interestingly it does mention commissioning and the "need to reduce redundant information gathering." It appears FDA through this draft document has finally given recognition to the practice of commissioning by mentioning it in the document.

Position Paper: Are We Abandoning IQ and OQ?1

It has been quite apparent to some of us in the pharmaceutical and medical-device industries that there appears to have been a directed effort over the past number of years to eliminate the concept of and need for the installation qualification (IQ) and the operational qualification (OQ). These two techniques were developed by the industry in answer to the validation requirement mandated by the US Food and Drug Administration (1). The purpose of IQ and OQ was to verify that equipment and systems were able to perform as intended.
Over the years, with the need to compress the timeline for products to be marketed and to decrease the cost associated with the build-out of a new facility or process, IQ and OQ documents have been massaged and varied in complexity and content. The IQ and OQ were also combined into a single-document format to save on paperwork as well as review and approval time. This new combination became known as the IOQ.
Industry over the years has been pushing FDA for acceptance regarding a cutback on the apparent redundancy associated with the validation process. It was argued that those validating were conducting tests that had already been performed during equipment design and installation. Quality assurance (QA) was also to blame since they were reviewing aspects of the installation and qualification that were not necessary. They were a bottleneck due to the time required for review, intrusive question and answer sessions, minuscule document oversights, and unessential general approval.
Today many companies still follow the premise of IQ and OQ, but the introduction of other terms has downsized the importance of these activities. In particular, the term commissioning was introduced into the vernacular of the industry. The purpose of commissioning was actually threefold:
  • Commissioning was used to capture the pre-installation Factory Acceptance Test (FAT) and installation testing that was being performed on the equipment and systems being installed.
  • Commissioning was viewed as taking the place of the need to qualify those systems and equipment that were not deemed critical but supportive in nature. Systems such as plant steam, vacuum, and heat transfer no longer required qualification. Commissioning allowed them to stand on their own documentation merits and any associated verification would reside in the associated commissioning documentation. New terms such as good engineering practices (GEP) would ensure that these documents were correct and usable.
  • The third purpose of commissioning was to bridge the gap between design and installation, which was start-up. Using the information afforded through a commissioning program would reduce the apparent redundant information gathering and testing that validation was being accused of performing.
Over the same period of time, practitioners of commissioning were including more and more of the then-understood IQ and OQ tests as part of the commissioning exercise. This practice has been altered to such an extent that the IQ and OQ have been reduced to lists indicating that prior commissioning test had been properly completed. In essence, documents (IQ and OQ) that were quite large in size in the past now are the smallest in volume. This occurred to such an extent that the IQ and OQ are now understood by some in the industry as useless documents because they had been reduced to simple lists of prior test results.
These same criticisms did not mention other qualification test requirements such as the handshaking between equipment, the testing of narrowed specificity of operational parameters associated with the particular process in mind, or the added computer-related programming or interfacing that may be necessary. It has also become acceptable to have the pretreatment aspects of critical utilities commissioned only and the final purification or critical process steps considered for qualification.
Role of QA
QA was always to be the independent reviewer and approver. QA personnel had no direct role in the design or manufacturing processes. Their reporting structure also was to be independent and separate from engineering and manufacturing. They were mandated with maintaining quality and an independent status through the regulations.
During the same timeframe, we have seen the erosion of QA in the qualification effort. Validation, which originally resided in QA, was moved to either engineering or technical services. The reason for this was that only those disciplines could properly test the equipment and systems because they had the necessary experience and education. Logically this may be justified, and many companies today have already made the move. In some cases, even the performance qualification (PQ) and process validation (PV) aspects of validation have also been removed from the QA umbrella.
With the original IQ and OQ, QA personnel reviewed and approved each document. They also reviewed the summary reports that followed regarding these activities. With the onset of commissioning, the role of QA in the overall qualification scheme came into question. Nowhere in industry guidelines was it stated that QA should review commissioning tests and commissioning-related documentation. Again, the commissioned systems and equipment would stand on the merit of their respective commissioning documentation.
Some firms introduced the term commissioning closeout reports as an effort to include QA review and involvement. Other firms included QA as a team player in the overall process, but the approval status was removed. QA was only to substantiate that critical systems were properly tested, qualified, and approved.
The concern with all of this shifting of responsibilities as well as approvals was that QA personnel were still the ones defending the company activities to the FDA and other regulatory bodies. QA is typically the group defending the company's practices and applications during an FDA inspection and not those who commissioned or reduced the involvement of QA in the overall facility-qualification effort.

Wednesday, August 4, 2010

Qualification, Validation, and Verification 4

"If clearly visible growth of microorganisms is obtained after the incubation, visually comparable to that in the control vessel without product, either the product possesses no antimicrobial activity under the conditions of the test or such activity has been satisfactorily eliminated. The test for sterility may then be carried out without further modification."
It may be advantageous, and more consistent, for the text in Chapter ‹71› to be changed to "Suitability of the Test Method," if not to "Verification of the Test Method." The latter change also may be appropriate for Chapters ‹61› and ‹62›, given that what is being assessed is the verification that the actual test conditions relative to those established during the validation permits the proper functioning of the method. Given the harmonized status of these three chapters, such changes, although possible, would certainly take longer to become official.
The same cautions provided at the end of the section on validation are applicable here. If a method in use previously was derived from a pharmacopeial method but used for a purpose other than satisfying monograph requirements, it is not necessary to adopt a revised method in the pharmacopeia when it becomes official. It is therefore not necessary to reverify the suitability of your test article to the revised method. Likewise, the use of a nonpharmacopeial method for purposes other than satisfying a monograph requirement when a pharmacopeial method exists of potential relevance does not necessitate reverification.
General requirements for validationThere are numerous documents that describe the general approach to a validation process. They describe several characteristics (data elements in Chapter ‹1225›) that may be examined during validation, with specific sets selected based upon the nature of the test method. A brief description of these characteristics is provided herein using the characteristics as outlined in the IC Harmonization Harmonized Tripartite Guideline, Validation of Analytical Procedures: Text and Methodology.
Accuracy is a determination of how close the measured value is (in the case of an analytical method) to the true value. As such, one might define accuracy of method as equal to true value plus error. Error may contain both the systematic error (bias) and imprecision of measurement. With the potential error possible, it is important to include a means of reflecting the "true value" as closely as possible. For many compendial tests, this involves the use of a reference standard. Because a method is expected to be useful over a range of true values, the accuracy should be assessed over the expected range of values to which the method is to be applied. As stated previously, the validation should also state the conditions under which the accuracy was determined. Because it is not possible to determine all possible sets of conditions for which a compendial assay might be applicable, accuracy may need to be verified before use of a validated method. The concept of accuracy is more problematic for microbiological assays.
The precision of a method determined during validation should be representative of the repeatability (reproducibility) of the method. As was the case for the determination of accuracy, it should be determined over the expected range of articles to be measured, and the conditions used during the validation should be clearly stated. As for accuracy, the use of reference standards is common because the goal of the assessment of precision is to determe method repeatability without introducing unknown variance as a result of different test articles or test articles drawn from a heterogeneous source. The latter point also complicates the validation of microbiological assays.
Specificity refers to the ratio of false positives to false negatives. A highly specific method would have a very low ratio, given that it should be able to detect the article of interest present in very low quantities in the presence of much higher quantities of similar but not identical articles. As stated previously, specificity should be determined over the expected range of usage for the method, and conditions used during the validation should be clearly stated.
Linearity, in essence, refers to the existence of a direct relationship between the quantity of article contained in the sample being analyzed and the measured value resulting from the analysis. It is not the purpose of this article to delve into statistical intricacies pertaining to data transformation, the use of linear or nonlinear regression techniques, residual analysis, and so forth. Currently, it is sufficient that an assay purporting to be quantitative in nature must have a demonstrable quantitative relationship between the quantity of material of interest contained in the sample and the measured response.